Products Description
Choose this assembly when the equipment has its own power terminals and control connector. The open ends allow the pack builder to select lugs for the installed studs and route the four signal cores to the control terminals. For a replacement forklift battery lead, match the existing plug coding and signal assignments before specifying how the free ends should be prepared.
Technical specifications
Nominal assembly length | 3 m |
Connector end | REMA DIN 320 female battery socket with auxiliary and pilot contacts |
Equipment end | Unterminated power and signal leads. Strip lengths to order. |
DC power conductors | 2 × 95 mm², one positive and one negative |
Signal cable | 4 × 2.5 mm², with CAN and pilot wiring to the equipment drawing |
DIN connector rating | 320 A, 150 V DC at the connector. Specify the required continuous current and duty cycle for the finished cable. |
Request a quote
Send the mating plug reference or a photo of its contact face, the required strip lengths and the signal pinout with your quantity.
Tags:
