Products Description
Product Overview
The Velonix 208kWh / 120 kW DC Energy Storage EV Charging System is a floor-mounted, battery-integrated fast charging solution engineered for quick deployment where grid capacity is limited or construction lead time is long. With dual DC charging guns, flexible connector options, and intelligent energy management, it delivers stable 120 kW fast charging without requiring high-power grid upgrades—enabling operators to launch charging services immediately and scale efficiently.
Key Value Propositions
1) Quick Deployment, Minimal Site Work
Install-ready floor-mounted architecture
No trenching, transformer expansion, or long permitting cycles in most cases
Ideal for temporary, pilot, or rapidly expanding charging sites
2) No Grid Capacity Challenge
High-power output comes from the integrated battery system
Grid connection (if used) can be lower-power for off-peak recharge
Enables DC fast charging even at weak-grid or limited-capacity locations
3) Dual-Gun Fast Charging
2× DC output supports sequential or simultaneous charging (power-sharing configurable)
Optimized for higher utilization and shorter waiting times
4) Multi-Connector Compatibility
Supports different charging connector configurations for regional requirements and mixed vehicle fleets
Typical options: CCS2 / CCS1 / CHAdeMO (single or dual, or mixed)
Suitable for multi-standard markets and cross-border operations
5) Commercial-Grade Safety & Reliability
Built with multi-layer protection logic and industrial-grade components
Designed for long duty cycles and public-facing operation
Hybrid Energy Operation (Solar + Wind + Grid)
This model can be deployed as a hybrid energy charging hub, combining:
PV recharge during daytime
Wind recharge when wind resource is available
Grid recharge as backup or for off-peak energy filling
This architecture provides:
Higher system uptime
Lower energy cost
Reduced dependency on grid expansion
Strong marketing value for “renewable-powered charging”
Tags: mobile ev charge station
